Processing Plant
Our operating partner, Gold Horizons SAC, owns and operates the Yuromayo mineral processing facility.
Although the plant is licensed to process up to 300 tonnes per day the current name plate capacity is 40 tonnes a day. The short term plan is to bring in a conical crusher and some larger agitation tanks to run alongside the current cycle. These upgrades will very quickly bring the name plate capacity to more than 150 tonnes per day.
The plant is running a carbon-in-pulp cycle with crushers, mills and agitation tanks. The property has ample room to expand beyond the 300 tonnes per day licensed capacity and planning has started to place a flotation processing plant to run alongside. There is a working lab and office on site as well as lodgings, kitchen and amenities with working plumbing.
There is no on site "gold room". Currently the carbon (the end product from the plant) is transported to a 3rd party processing company nearby where gold bars are molded. There are plans to build a "gold room" at a secure location off site.
Processing the ore at the Yuromayo processing plant ensures the following:
- Low cost of processing and transportation.
- Quality control over processing procedures.
- Highest quality gold produced.
- Safer for community and less environmental impact than mercury processing plant.
Suppliers
We currently maintain relationships with a high number of suppliers across Peru. All of them are legal, formal and regulated businesses. The capacity of these suppliers varies between 50 to 500 tons per month.
Infrastructure of the Yuromayo Processing Plant
The Processing Plant has a 5,000 m2 Ore Yard already constructed, which can host up to 96,500 Tons.
10” x 16” Jaw Crusher, which is able to produce up to 3 HMT of 1⁄2” crushed stones. That is, the Plant is able to process 24 DMT, 36 DMT or 72 DMT whether it works 8, 12 or 24 hours a day, respectively.
2’x3’ Hammer Mill, which is able to produce up to 6HMT, that is, 48,72 or 144 DMT whether it works 8, 12 or 24 hours a day, respectively.
2 Ball Mills, a 3’x4 ́ and a 4’x 4‘, which are able to jointly produce 16,24 or 47 DMT, whether they work 8, 12 or 24 hours a day, respectively.
3 Lixiviation Tanks, 3m x 3.5m, which can process 60 DMT.
3 Activated Carbon Tanks, 2m x 2.5m, which can process 20 DMT
Tailings Pond of 1,800 m3, which can contain 93 MT of Tailings.
2 Power Generators, a 353 HP Volvo Penta and a 75 HP Caterpillar, which jointly can provide nominal 552 kVA.
Complete Chemical Laboratory.
Currently, the Plant is set to use fuel for Power and buying Water from a tank.
It has a lodgings and amenities able to host 20 people.